Bathroom scope
What gets done — properly — in every PrimoQuo bathroom.
We don't tile over old tile. We don't paint waterproofing. Bathrooms are the room most likely to embarrass a contractor five years later, so we take the time to do them right.
Included in scope
- Full hack-out to concrete slab, including existing screed
- Two-coat cementitious waterproofing membrane on floor and lower walls
- 48-hour standing water test before screed pour, photographed and signed
- Plumbing rerouting and brass-fitting hot/cold mixers
- Tiled wet wall, dry wall and floor with chamfered edging
- Vanity carpentry with sealed plywood and laminate or solid-surface tops
- Frameless glass partition or shower screen install
- Rain shower, hand shower and exhaust fan install
- Soffit drop where soil pipes need rerouting
Typical investment
A 5–6 sqm condo bathroom comes in around RM 32,000–RM 48,000 for a full hack-out remodel. Larger master baths with freestanding tubs and double vanities land around RM 60,000–RM 80,000. Light-touch refurbs (keep tile, swap fixtures and vanity) start near RM 14,000.
How long it takes
Plan on four to six weeks on site for a full hack-out. The waterproofing cure time is non-negotiable — we'd rather lose a day than chase a leak six months later.