Bedroom scope
What goes into a PrimoQuo bedroom suite.
Most bedroom briefs start with "we need more wardrobe space." We dig a little further: how do you actually wake up, what wakes you up that you wish wouldn't, and where does the morning light hit the bed?
Included in scope
- Layout review and storage audit before drawings
- Fitted wardrobe carpentry with internal lighting and laundry-bag drops
- Custom headboard and bedside joinery
- Three-layer lighting plan: ambient, reading and accent
- Dimmable circuits and bedside USB-A and USB-C outlets
- Acoustic improvements where corridor or street noise is an issue
- Blackout curtain track planning and install
- Wallcovering or feature-wall paint specification
- Carpet, vinyl plank or solid timber flooring options
Typical investment
Light-touch master suite refresh (paint, lighting, fitted wardrobes): RM 22,000–RM 38,000. Full overhaul including ensuite link, custom joinery and reflooring: RM 55,000–RM 95,000. Suite + ensuite combined projects start near RM 78,000.
How long it takes
Three to four weeks on site for a master bedroom-only project; five to seven weeks for a combined suite + ensuite. Most of that time is custom carpentry — the joinery shop runs five working days behind the on-site demo.